Multi-Building Campus Arc Flash Compliance & Power Systems Study

Client: Fortune 200 Industrial Testing Facility
Project Type: Campus-Wide Safety & Regulatory Compliance
Service: Power Systems Engineering & Expedited Audit Readiness

IMG_0923.jpeg
IMG_0685.jpeg
IMG_0784 (1).jpeg
IMG_0638.jpeg
Project Overview


In response to an impending impromptu audit, I executed an accelerated an arc flash and short circuit study for a massive, six-building industrial testing campus. The project required rapid data collection and analysis to ensure the facility met all safety, insurance, and regulatory requirements on an urgent timeline.


Core Services Provided

 
  • Expedited One-Line Documentation:​ Developed and updated accurate single-line diagrams for the entire six-building electrical network, providing the foundation for campus-wide safety and maintenance.
  • Arc Flash Study: Performed a full Short Circuit Analysis and Arc Flash Study to determine fault levels and incident energy across all critical nodes.

 
  • Safety Labeling & Compliance:Expedited the application of Arc Flash labeling across the campus, ensuring 100% compliance with NFPA 70E and OSHA requirements.

 

  • Deficiency Identification: Performed a broad sweeping deficiencies check, identifying and prioritizing infrastructure risks that required immediate remediation prior to the audit.

 
  • Audit Advocacy:​ Provided the technical documentation and engineering validation necessary to satisfy the Fortune 200 company’s internal and external auditors.

 

Technical Impact

 
  • Rapid Turnaround:​ Successfully completed the campus-wide analysis under an expedited schedule, allowing the client to pass their audit, avoiding non-conformance penalties.
 
  • Risk Mitigation: By identifying system deficiencies early, the facility was able to address safety hazards before they led to equipment failure or personnel injury.
 
  • Operational Transparency:​ The updated one-line diagrams provided the facility's maintenance teams with the clarity needed for safe switching and future expansion.

Project: Data Center Infrastructure Reclamation

Project Type: Mission-Critical Modernization & Adaptive Reuse
Service: Electrical Design, Engineering Oversight & Operational Load Planning

image_ed738d6f.png
Project Summary


This project involved the electrical revitalization of an abandoned data center. The goal was to reclaim the facility’s utility and standby power assets to support a new 1,200 amp mission-critical load. By integrating an Automatic Transfer Switch (ATS) and existing standby generation, the design achieved a dual-source power architecture for maximum uptime.


Technical Highlights & Service Delivery

 

  • Dual-Source Power Integration: Engineered the connection between utility service and the existing onsite generator through a newly integrated ATS, ensuring the 1,200 amp Distribution Center has seamless access to redundant power.

  • Connected Load Analysis: Performed a detailed load analysis of the client's existing facility to determine maximum server load that could be connected. This data-driven approach allowed the customer to optimize rack density while maintaining safe operating margins.

  • Power Systems Analysis: Conducted a Short Circuit Analysis to verify equipment ratings and implemented Arc Flash reduction measures to lower incident energy, ensuring NFPA 70E compliance and technician safety.

  • Engineering Oversight & Permitting: Acted as the primary technical lead for the permitting process, navigating jurisdictional codes to successfully integrate legacy infrastructure with modern distribution components.

  • Owner's Representative Engineer: Provided real-time technical guidance during equipment procurement to verify that selected electrical gear met system requirements and compatibility needs.

Operational Impact

  • Informed Scaling: The Connected Load Analysis provided the client with a clear roadmap for server deployment, preventing over-provisioning and infrastructure strain.

  • Reliability: Established a redundant power path protecting against utility outages.

  • Safety & Compliance: Reduced "request for information" (RFI) cycles during permitting and provided a safer work environment through arc flash mitigation.

  • Profitability: Cost efficient design minimized first costs to owner and maximized ROI.

Contact

Ready to secure your facility and ensure full regulatory compliance? Contact Arc Defense Engineering Solutions today for a specialized consultation. Whether you need to update your NFPA 70B/70E compliance or require a comprehensive dual-discipline system analysis, we provide the expert oversight your project demands.

469-315-3517

Request a Quote or Schedule a Discovery Call to review your one-line diagrams and receive a tailored project scope.